DIMO Industrial Engineering Department recently commissioned Matara Stage IV Water Supply project in Sri Lanka.
High quality water is critical for both industrial processes and for human consumption. Water disinfection process plays a major role during any water treatment scheme.
DIMO has been providing comprehensive disinfection solutions with innovative technologies for the municipal water industry since many decades.
In order to maintain chlorine residual in the water distribution system and thereby to ensure high level of consumer protection, feeding of controlled streams of diluted chlorine solutions to treat the water of the plant is carefully performed through a proper injection system supplied and installed by DIMO.
The chlorination system operates fully automatically while adapting to the demands received from the Supervisory Control & Data Acquisition (SCADA) system.
DIMO completes commissioning and handing over of Kalmar Essential Reachstacker DRU45 to South Asia Gateway Terminals (PVT) LTD recently.
This Kalmar reachstacker is equipped with Kalmar adjustable 20’-40’ spreader with side shift =/- 800mm. The machine is capable of stacking ISO 9.6ft 20’-40’ loading container up to 5 high. Also, this machine is fitted with an exceptional fire suppression system, to protect the operator and machine from fire.
Mr. Romesh David - Chief Executive Officer (SAGT), Mr. Upul Jinadasa - Chief Operating Officer (SAGT), Mr. Sandun Edirisinghe - General Manager Engineering (SAGT), Mr. Champika Palayangoda - Senior Manager Engineering (SAGT), Janith Chamikara - Assistant Manager Engineering (SAGT), Mr. Gahanath Pandithage- Group Chief Executive Officer (DIMO), Mr. Chaminda Ranawana - Executive Director (DIMO), Mr. Dananjaya Peter - Business Unit Manager of Storage & Material Handling Solutions Division (DIMO), Mr. Gayan Nandasiri - Product Manager (DIMO), Mr. Dishan Bandara - Service Engineer (DIMO) and Mr. Srinath Madusanka - Customer Support Engineer (DIMO) participated at the ceremonial handing over held at South Asia Gateway Terminals (PVT) LTD, Port of Colombo.
Elevators - Faculty of Technology of the University of Colombo in Pitipana
X
DIMO Elevator & Escalator solutions team successfully completed the project - Faculty of Technology of the University of Colombo in Pitipana by supplying, Installing, Testing, and Commissioning four nos of state-of-the-art TKE passenger elevators of Evolution 1 MRL model. This is the second successful installation by DIMO for the university whereas the first was for the chemistry department building at the faculty of science. Proving its excellence in proving the state-of-the-art TKE elevators, the elevator installation work for the pre-clinical department at the faculty of medicine and the Help Zone building of the university are also currently ongoing and nearing completion.
The main contractor of the project is the International Construction Consortium (ICC) and the DIMO elevator team is currently involved in another two important projects of ICC by providing elevator solutions for the Faculty of Technology in both Sabaragamuwa and Kelaniya universities.
In response to the introduction of the “Technology Stream” for Advanced Level curriculum, most of the universities took up the challenge to accept students from this stream who qualify to enter the university, in a new faculty called the Faculty of Technology. DIMO is proud to add value with its best-engineered solutions for these universities to further step in their march towards achieving excellence and providing unique opportunities to the Sri Lankan youth.
DIMO Elevator solutions were provided for five different buildings at the University of Peradeniya , the largest university in Sri Lanka, which was originally established as the University of Ceylon in 1942.
DIMO carried out the scope for supply, Installation, Testing and commissioning of 05 TKE passenger elevator units out of which 04 units are in the Synergy model for the existing buildings in order to allow easy access for differently able students. 01 unit of in Meta 200 model was installed at the newly constructed arts faculty Building. The maintenance scope of all these 05 elevators will also be carried out by DIMO.
DIMO Elevators have marked strong footprints in the university segment by successfully completing the university of Kelaniya, University of Colombo and private university projects previously.
As the recent developments within the university premises were done in order to improve the university's infrastructure and enhance the study experience of students, DIMO is proud to involve in the project by providing state-of-the-art, world-class elevator solutions to best serve the needs of all the stakeholders.
DIMO recently completed a Dual Car Elevator System at Macksons Developers (Pvt) Ltd, Colombo 03.
The elevator travels through 5 floors while serving 4 floors allowing vehicles to travel vertically inside the building. This is a machine-room type car elevator system with Autocall function, which makes the driver's life easier where the driver doesn't have to toggle any switch to open the door of the elevator. This is yet another state-of-the-art car parking system installed by DIMO.