Sri Lanka Telecom (SLT), the country’s leading telecommunications provider has taken a giant leap forward in their vision to become the hub of telecommunications in South Asia. Realizing that the SLT Logistics Centre principal warehouse was in need of a change, SLT approached DIMO for a total solution. DIMO used the finest brands in their design and installation of the SLT warehouse including SSI Schaefer for the racking system, Komatsu for the provision of electric forklifts and a reach-truck, Siemens for the warehouse’s security systems and fire alarms, and OSRAM, Davis and Vossloh Schwabe for their complete lighting system.

The Solution

After initial assessments of the warehouses by the DIMO Team, identifying the different products and the number of different locations that the offices used in their logistic process, DIMO conceptualized a proposal to have all their stock, offices and even their inspection site under one roof.

SLTs’ need for a systematic warehouse solution was fulfilled with the introduction of a selective racking system for their palletized cargo together with a Long Span shelving system with SSI Schaefer for SLT’s telecommunication accessories, mezzanine for furniture fittings etc. This contributed to SLT Logistics being able to save office space of up-to 168 square meters and 4,868 square meters in warehouse space.

Control wiring of all PLC units at UM, NK & KA panels of 08 numbers of Diesel and 12 numbers of stand-alone Generator sets. Testing and hot/cold commissioning of all PLCs, Control wiring, Input/outputs and alarm/tripping conditions.

A unique solution was introduced in-which the power consumption of 38 high bay lamps were reduced by the utilization of daylight with a skylight fixtures. DIMO also arranged for training of the SLT employees in Germany and Malaysia to effectively learn how to use the new warehouse management system that was installed while obtaining a first-hand look at the operational flow of a modern warehouse.

Conclusion

Goods that previously filled up four warehouses were brought down to two by the introduction of the DIMO Location Based Storage System (LBSS). Instead of customers having to stop at several places for all their transactions, DIMO’s proposal effectively brought it down to just one location. This resulted in a considerable improvement in operational lead-time and more importantly, customer satisfaction.